| |
|
| |
Functional principle of the Guide Bushings
|
| |
Illustrated here using a series FSL guide bushing with integrated clamping screws. The principle applies to all the listed series. |
|
The principle is shown in a simplified diagram with enlarged play. |
| |
 |
|
Connection with assembling play between the housing, guide bushing and centre sleeve.
|
| |
 |
|
First phase of axial pre-stress: Assembling play between housing and guide bushing eliminated, firm fit realized.
|
| |
 |
|
After further axial pre-stressing, the guide play between the guide bushing and sleeve is optimally adjusted.
Back
|